ANALISIS PENGARUH MEKANISME KORDINASI TERHADAP SCHEDULE INSTABILITY DAN TOTAL BIAYA PADA LEVEL MPS DI ENTITAS RANTAI PASOK SEDERHANA DENGAN MEMPERTIMBANGKAN LEAD TIME . (2019). Journal of Research and Technology, 5(1), 66-80. https://doi.org/10.55732/jrt.v5i1.379