ANALISA RISIKO TAHAP PERAWATAN JALAN DALAM PENERAPAN PERFORMANCE BASED CONTRACT PADA PROYEK JALAN DI JAWA TIMUR

Eko Prihartanto

Abstract


Road as the main infrastructure in cross overland to connect starting area to the destination area. The level of damage that occurred after the implementation reduce the road’s service quality. Performance Based Contract (PBC) has stages such as Design, Build, Operation, and Maintenance. PBC is expected to minimize the budget for road construction due to damage that routinely occurs every year. PBC has the maintenance stage to meet the performance who have risk reducing road maintenance after road completion and operation. Risk variables in this study use variables in the maintenance stage from the PBC application in Eastern Java road project. It uses Probability Impact Analysis method to analyze road maintenance risk in PBC application. The results are highest score of risk variable in the maintenance stage as the descriptive analysis references to compare the threat and opportunity in PBC application. Then, it is used to create strategy in order to fulfil dominant risk in the maintenance stage.


Keywords


Road maintenance, Performance based contract, Risk.

Full Text:

PDF

References


Asiyanto. (2009). Manajemen Risiko untuk Kontraktor.

Hillson, D. (2002). Extending the risk process to manage opportunities. International Journal of Project Management.

Sujatsi, R., Wiguna, I.P.A., dan Kartika, A.A.G. (2014). Analisa risiko performance based contract pada pemeliharaan jalan nasional. Prosiding Seminar Nasional Manajemen Teknologi XX (pp. B-5-1 - B-5-9). Institut Teknologi Sepuluh Nopember, Surabaya.

Novianti, T. (2011). Pemodelan risiko pendapatan proyek infrastruktur jalan tol dengan pendekatan fault tree analysis. Jurnal Teknik dan Manajemen Industri, 138-149.

Pemerintah. (2006). Peraturan Pemerintah Nomor 34 .

PMI. (2008). A Guide to the Project Management Body of Knowledge (PMBOK Guide). Project Management Institute.

Prihartanto, E., & Wiguna, I. P. (2015). Pemodelan hubungan risiko performance based contract dengan interpretive structural modeling (Studi kasus proyek infrastruktur jalan di Wilayah Jawa Timur). Prosiding Seminar Nasional Teknik Sipil XI-2015 (pp. 639-644). Surabaya: Institut Teknologi Sepuluh Nopember Surabaya.

Soeharto. (2001). Manajemen Proyek Jilid 1. Jakarta: Erlangga.

Wahyudi, S. (2009). Penerapan Kontrak Berbasis Kinerja (Performance Based Contract) untuk Meningkatkan Efektifitas Penanganan Jalan. Jakarta: Tesis, Fakultas Teknik Universitas Indonesia.

Yasin, N. (2014). Kontrak Konstruksi di Indonesia edisi kedua. Jakarta: PT Gramedia Pustaka Utama.




DOI: http://dx.doi.org/10.5281/zenodo.2582208



__________________________________________________________________________________________________________________________

Journal of Research and Technology by Jurnal Teknik Unusida is licensed under a Creative Commons Attribution 4.0 International License. Based on a work at http://journal.unusida.ac.id. E-ISSN: 2477-6165 | P-ISSN: 2460-5972

Sponsored by:     Creative Commons License